Projects Details

Projects Details

Facility for Steel Bridge Construction

image

ZPMC has undertaken the fabrication of tunnel segment sinking barge for Tunel Engineering of Hong Kong-Zhuhai-Macau Bridge. The barge can sink the tunnel segment with 180m in length, 37.95m in width, 1 ] .5m in height, and 72,000t in weight.

 

ZPMC has undertaken the design and fabrication of leveling barge for Tune丨 Engineering of Hong Kong- Zhuhai-Macau Bridge. With 79m in length, 46m in width, 4.5m in depth and J Om to 50m in depth while work­ing, the ship can finish laying rubble of 180m for one tunnel segment within 8 days. It can work in water with depth up to 50m, and the leveling accuracy tolerance is up to ± 40mm.

 

 

image

In addtion to the fabrication of steel structures, ZPMC also supplies tunnel segment sinking barge, jackup-type rubble leveling barge, steel cylinders, steel cylinders vibratory piling machine, steel form- work for tunnel segment precasting, mooring positioning barge and floating crane for the construction of Hong Kong-Zhuhai- Macao Bridge.